Skip to Content

FDR Boulevard Project

Project to construct 3.7 miles of a two lane residential access way from MD Route 4 to Pegg Road (NAS Patuxent River main gate) to help relieve congestion and reduce delays along the MD 235 corridor by providing an alternative means for residents to travel to and from shopping and work, especially in the Lexington Park Development district. Project could remove thousands of trips per day in portions of the MD 235 corridor. Right-of-way width needed is 80' to 100'. The project will include a raised 8'-20' median with extensive use of traffic calming devices (i.e. narrow 10'-11' wide lanes and roundabouts), 5' pedestrian/6' bicycle accommodations, landscaping and decorative lighting.

If you have any questions, please contact the DPW&T Project Manager, Allen Settle, at (301) 475-4200 ext. 3525 (8:00 am to 5:00 pm). FDR Boulevard Project - Phase 2 between Great Mills Road (MD 246) and South Shangri La Drive has been completed.